Mon-Sat 8-5
Gravel driveway grading and repair by Big C Land Management
Roadbeds & Gravel Driveways

Gravel Driveways & Roadbeds in Anniston, AL

Steep, rutted or washed out — we rebuild the base so it holds up to Alabama rain.

01The Work

Gravel Driveways & Roadbeds

Most driveway problems are base problems. When a gravel driveway is not crowned and graded right, every heavy rain runs straight down the middle and carries the gravel with it. On the hills around Anniston that happens fast — a drive that was fine in spring can be rutted and washed out by fall.

We regrade the roadbed, set the crown and drainage so water runs off the sides, and arrange the gravel delivery — whether it is a new driveway, a private road or an access path to the back of your property. Chris Densmore runs every job himself, and steep, washed-out drives are some of our most common work.

Our customers mention grading steep, deeply rutted and washed-out driveways and arranging gravel delivery. Residential and commercial, across our 50-mile radius.

A driveway that sheds water correctly can go years between regrades; one that does not will need gravel hauled back in after every big storm. So the goal is not just to make it look smooth today — it is to set the shape so the next rain runs off the sides instead of down the middle.

Regraded gravel driveway with proper crown and drainage by Big C Land Management
Fast & Free On-Site Estimate

Get Your Free On-Site Estimate

Or Call Chris Directly:(256) 252-2741

Tip: You can also text photos directly to (256) 252-2741.

02Signs It's Time

Signs You Need Gravel Driveways & Roadbeds

01

Ruts and potholes come back after every rain.

02

Gravel washes into the yard or the road.

03

A steep driveway is hard to climb in wet weather.

04

Water runs down the middle of the drive.

05

You need a new driveway to a building site.

06

You need an access road to the back acreage.

How We Do It

The Process, Step by Step

01

Text us photos

02

Free on-site estimate with a gravel estimate

03

Regrade and shape the roadbed

04

Set the crown and drainage

05

Gravel delivered and spread

06

Final pass

03Your Options

Choose the Right Approach

Driveway Repair & Regrade in Anniston, AL — Big C Land Management

Driveway Repair & Regrade

Fix ruts, washouts and potholes by re-crowning and regrading the existing roadbed.

New Gravel Driveway in Anniston, AL — Big C Land Management

New Gravel Driveway

Build a new driveway from the ground up — shaped, crowned, drained and gravel laid.

Private Road or Access Path in Anniston, AL — Big C Land Management

Private Road or Access Path

Create a durable access road to back acreage, a building site or a remote field.

04Estimate Your Gravel

Gravel Driveway Calculator

Gravel Driveway Calculator

Estimate cubic yards & tons instantly.

Cubic Yards
14.8
Est. Tons
20.7

Estimate only — actual tonnage depends on stone type and base condition.

Driveway Doctor

What Is Your Gravel Driveway Doing?

Tap the problem that matches your drive. We'll show the likely cause and how Big C fixes it.

Fast & Free On-Site Estimate

Get Your Free On-Site Estimate

Or Call Chris Directly:(256) 252-2741
05Real Job Photos

From the Field

Gravel Driveways & Roadbeds job photo 1 in Anniston, AL
Gravel Driveways & Roadbeds job photo 2 in Anniston, AL
Gravel Driveways & Roadbeds job photo 3 in Anniston, AL
Gravel Driveways & Roadbeds job photo 4 in Anniston, AL
Gravel Driveways & Roadbeds job photo 5 in Anniston, AL
Working With Alabama Ground

On Alabama hills, a gravel driveway needs a crown — a raised center so water sheds off both sides into the ditch instead of running down the middle. Without it, every rain carves ruts straight down the drive and washes the gravel downhill.

We also cut side ditches so the water has somewhere to go. That combination — crown plus drainage — is what keeps a gravel drive from washing out, not just adding more gravel.

On a steep drive, we also watch where the water comes from above — a ditch or berm at the top can keep runoff from sheeting down the drive in the first place. Crown, side ditches, and upper drainage together are what hold a hillside gravel drive together.

What Affects the Price

A gravel driveway is priced on the length and width, the condition of the existing roadbed, how much regrading and ditching it needs, the gravel depth and tonnage, and access. A repair and regrade is a different job from building a new drive from scratch.

Gravel tonnage is a big part of the cost — use the calculator on this page for a rough number, and we confirm the exact tonnage in the estimate.

Chris gives every estimate free, on site. See our what it costs page for what drives pricing, or text us photos for your free on-site estimate.

Can We Get In?

Driveway work usually has good access — the drive is the access. But on steep hills or wooded lots, getting equipment to the top of the drive can be the challenge. Compact equipment handles tight or steep access better than full-size machines.

Text us a photo of the drive, especially any steep or washed-out sections. Before we arrive, move vehicles off the drive and clear any low branches we might hit.

After the Job

When we leave, the roadbed is regraded and crowned, the drainage is set, and the gravel is spread and leveled. The drive should shed water off the sides instead of down the middle.

Let the gravel settle through a few rains before you expect a perfectly tight surface — it compacts as it packs in. A light regrade down the road keeps it crowned and tight for years.

Before We Show Up
  • 1Move vehicles, trailers and boats off the drive.
  • 2Clear low branches we might hit on the way in.
  • 3Point out any buried lines, water lines or culverts under the drive.
  • 4Mark any section you especially want fixed.
  • 5Have a spot for the gravel truck to dump if delivery is part of the job.
DRIVEWAYS
06Why Big C

Locally Owned. Run by Chris Himself.

Locally Owned in Anniston

Based right here in Calhoun County — we know the land, the clay and the rain.

Chris Does Every Job Himself

You talk to the owner, not a call center. Chris Densmore runs every job personally.

Alabama State License #2700106 · Insured - $1 million policy

Licensed and insured, in business since January 2023 with 5 years of hands-on experience.

Free On-Site Estimates — Text a Photo

Snap a few photos, text them over, and Chris comes out to look at the property for a free on-site estimate.

Residential & Commercial — serving a 50-mile radius around Anniston, 16 towns across East Alabama.

07From a Customer
“Chris did an excellent job with grading and gravel on my side yard! I would highly recommend!”
Dylan W.
Residential Homeowner
08Questions

Frequently Asked Questions

Usually the roadbed isn't crowned or graded, so water runs down the middle instead of off the sides. We re-crown and regrade so water sheds off the drive.
10Where We Work

Areas We Serve

Based in Anniston, serving 16 towns across Calhoun, Talladega, Etowah, Cleburne & St. Clair counties.

Ready When You Are. Text Us a Photo.

The fastest way to a free on-site estimate is a quick text with photos. Chris replies personally.

Call NowText Photos